Owner :
Daelim Industrial / Sadara Chemical Company(Joint Venture by Saudi Aramco and Dow Chemical)
Location :
Jubail, Saudi Arabia
Scope of Supply :
Refractory Engineering, Material Supply
Background
In 2011, Daelim Industrial has won a$920.3m (€635m) contract to build the main mixed-feed crackerfor what was the world’s single largest petrochemicalsconstruction project.
The cracker will feed a $20bn petrochemical complex beingbuilt at Al-Jubail on Saudi Arabia’s Gulf Coast by SadaraChemical Company, a joint venture involving state energygiant Saudi Aramco and Dow Chemical.
Project Summary
Packages
• Field Installed Refractory
- Monolithic Castable
- Insulating Fire Brick
- Mortar
- Ceramic Fiber Blanket
- Ceramic Fiber Paper
- Ceramic Fiber Board
- Calcium Silicate Insulating Board
- Anchors
•Vacuum Casting
- Peep Door Block
- Peep Door Plug
- Silplate Mass
•Tube Seals
- Tube Seals
- Multi Tube Bellows