  • Owner :

    LOTTE Chemical Titan Malaysia Sdn. Bhd.

  • Location :

    Pasir Gudang, Johor, Malaysia

  • Scope of Supply :

    Material supply, Installation, Supervision

Background

This Project was invested in Johor Bahru in Malaysia with plan to produce 107,000 tons ethylene, 125,000 tons propylene and 134,000 tons BTX. Insulation Korea supplied materials and installed both shop & field refractory construction applied to whole refractory lined pipe and Orifice Chamber.

  • Project Summary

    - Service Field : Petrochemical
    - Equipment : Lined Pipe & Orifice Chamber
    - EPC : GS E&C & Lotte E&C

  • Participate as

    - Refractory supply
    - Installation of refractory / Dry-out
    - Supervision of refractory construction

Delivery Scale

Delivery Scale 

 

ᆞRefractory Material Supply & Installation    

      - July to Dec 2016 Shop Installation 

      - April to June 2017 : Field Installation 

      - Insulation Korea shortened the construction period about a month 

      - Inspection for all materials and supervision after refractory construction 

Materials 

   - Refractory Castable 300,000 kg 

   - Anchor               40,000 pcs 

   - Ceramic Fiber       300 box